Kilimanjaro Trekking – Machame Route
The highest volcanic massif in Africa, it offers spectacular views and emotions. The Machame route is one of the least traveled and most demanding, but rewarded by incomparable views, with overnight stays in tents.
Departures guaranteed at least two participants on the following dates on site
Arrival and accommodation at the Mountain Inn. Meeting for the pre-trekking briefing.
Start of the trek from the entrance of Machame (1800mt) through the forests.
(trekking: 5-7 hours about 9 km)
Continue across the grassy moor through the Shira Plateau
(trekking: 5-7 hours about 7 km)
Continue trekking to Campo Burranco (trekking: 6-8 hours about 10 km)
Acclimatization day to prepare for the steep climb of the Burranco wall (trekking: 3-5 hours about 6 km)
A short walk in the steep areas and rock slabs through the alpine desert. (trekking: 4-5 hours about 4 km)
Around midnight start the trek to the summit to Stella Point (5740m) and then continue to Uhuru Peak (5895m). Descent to the Barafu campsite (trekking: 13-15 hours approx. 19 km)
Continue your descent through the forest area of the mountain to the Mweka gate (1680m). Transfer to Moshi. (trekking: 3-4 hours about 10 km)
Breakfast and transfer to the airport.
Safari extension or beach stay on request.
Tariff per person, starting from:
Departure | Double | Supplement single |
---|---|---|
From 23 January 2021 to 13 December 2021 | € 2,180 | € 260 |
Notes
(B / L / D): B = breakfast; L = lunch; D = Dinner
Guaranteed departures for at least two participants on the following dates on site:
Important : We also remind you that there is a ban on the import and use of plastic bags throughout the country. Please notify all customers arriving in the country about this prohibition
Advice on recommended tips:
GUIDE (USD 80) PORTER (USD 40) COOK (USD 50)
Reference exchange rates for currencies:
Currency: US dollar (USD) – Exchange rate: 1.19
Exchange rate variations with fluctuations greater than 3% will result in an adjustment of costs and will be communicated within 20 days of departure.
Currency block: € 50 per file.
The customer has the possibility to permanently block the cost of ground services which will no longer be subject to currency fluctuations. The request must be made simultaneously with the confirmation.
The tariff includes
The tariff does not include
Trekking in Mongolia at Tavan Bogd Tavan Bogd is a mountain massif in Mongolia, located near the border with China and Russia. Its highest peak, the Hùjtnij Peak, formerly known as Nairmadal Peak, or the “Peak of Friendship”, is the highest point in Mongolia, is located at 4374 meters above sea level and has a […]
Trekking on Kilimanjaro Kilimanjaro, with its three volcanic cones Kibo, Mawenzi, and Shira, is a dormant stratovolcano located in northeastern Tanzania. With its 5895 meters, it is the highest mountain on the African continent, the highest single mountain in the world, and one of the highest volcanoes on the planet as well as being one […]